Foundation cost in Ireland

A slab is priced per m² and a foundation per metre, for your job: the area and depth, the concrete grade, the steel, access for the truck and what's under the slab. Send the job and you get a written price.

A foundation's price follows its volume and its dig. A plain strip under TGD A starts at 400 mm wide and 200 mm thick on good ground: 0.08 m³ of concrete a metre. Trench fill can take several times that.

Free, no obligation. One local concrete contractor prices it, not five.

Concrete in a strip foundation

Strip (width × thickness)Per metre20 m of wall40 m of wall
400 × 200 mm0.08 m³1.6 m³3.2 m³
500 × 200 mm0.10 m³2.0 m³4.0 m³
600 × 200 mm0.12 m³2.4 m³4.8 m³
650 × 250 mm0.16 m³3.2 m³6.5 m³

Concrete in trench fill

TrenchPer metre20 m40 m
450 mm wide, 1.0 m deep0.45 m³9.0 m³18.0 m³
600 mm wide, 1.0 m deep0.60 m³12.0 m³24.0 m³
600 mm wide, 1.5 m deep0.90 m³18.0 m³36.0 m³

That's the trade: trench fill uses more concrete but no blocks below ground and no one working in the trench. A strip uses less concrete but needs the blockwork built up to ground level. Which costs less depends on the depth and the ground.

What decides the price

  • The ground. TGD A says a site investigation is essential where there's doubt about the subsoil, and always on loose sand, silt or soft clay.
  • The depth to firm ground, which sets the dig and the concrete
  • Strip, trench fill or raft, and any steel
  • Muck away: where the spoil goes
  • Water in the trench, and pumping it out
  • Access for the truck, or a pump
  • The engineer's design and inspections

What a foundation quote should list

  • The foundation type, width and depth, from the engineer's drawing
  • The concrete grade and volume
  • Steel, if any, and the cover to it
  • Excavation and muck away, priced separately
  • What happens if the ground is worse than expected: who decides and how it's priced
  • Blockwork to damp-proof course level, if it's included

Floors laid by the contractor who takes your call

Calls on this site ring JAM Floor Screeding: James Mulhall, based in Portlaoise, 25 years laying floors. Lines open Mon to Sat, 7am to 6pm. He pours concrete floors, slabs and foundations as well as screed. These are his jobs.

A screed pump and a worker in hi-vis outside a stone house being renovated
The pump on a stone house renovation
Underfloor heating pipes clipped down in rows across a floor, ready for the screed
Underfloor heating ready for screed
A large finished screed floor in a commercial building with glazed walls
Commercial floor screed

“JAM were punctual, professional and efficient and did an outstanding job on pouring our new floor as part of a renovation. Very highly recommend!”

David O'Keeffe, Google review

“Excellent work, laser level finish, neat and tidy worker, highly recommend.”

Cathal Kelly, Google review

“Top class work by james and his crew, highly recommend”

the duke, Google review

Quoted word for word from JAM Floor Screeding's Google reviews. Read them on Google

Get the job priced in 4 quick taps

Tell us about the job. It goes to one concrete contractor who covers your county, and they ring you to price it.

What's the job?

Pick the closest one. The contractor talks it through.

By sending, you agree to Concrete Contractors passing your details to one concrete contractor who covers your county, so they can contact you about the job. Privacy notice

Concrete contractors guides & price breakdowns

Straight answers to what people ask most: itemised costs, specifications, planning or grants, and what to check before you book.

More guides & resources: Concrete vs screed · Slab depth for an extension · Building Regulations for concrete · All guides & calculator hub · Technical & trade glossary · Frequently asked questions · All areas covered · About this site

Foundation cost questions

How much do house foundations cost in Ireland?

A slab is priced per m² and a foundation per metre, for your job: the area and depth, the concrete grade, the steel, access for the truck and what's under the slab. Send the job and you get a written price.

How much concrete is in a metre of strip foundation?

0.08 m³ for the smallest TGD A strip on good ground (400 × 200 mm), and 0.12 m³ at 600 × 200 mm. Our arithmetic.

Is trench fill more expensive than strip foundations?

It uses more concrete but saves the blockwork below ground and time in the trench. Which costs less depends on the depth and the ground.

Do I need a site investigation for foundations?

TGD A says it's essential where there's doubt about the subsoil, and always on loose sand, silt and soft or very soft clay.

Concrete contractors across all 26 counties

Requests from all 26 counties go to one vetted local specialist who covers your county — from Dublin, Cork, Galway and Limerick to Kildare, Meath, Wicklow, Waterford and Donegal. Pick your county below for local prices, specifications and advice. Compare all areas covered →

Get a free quote for the job

Four taps and your number. One concrete contractor who covers your county rings you with a price. Nothing is booked until you say yes.