Concrete contractors in Mayo

Concrete slabs, foundations, power floated floors, bases and yards across Co. Mayo, from Castlebar to the farms: a floor slab at least 150 mm on 200 mm of hardcore, foundations to the engineer's drawing.

Tell us about the job in four taps and one concrete contractor who covers your county rings you with a price.

Free, no obligation. One local concrete contractor prices it, not five.

  • 281one-off houses finished in Co. Mayo in 2025 (CSO)
  • 11,920farms (CSO)
  • 18%of homes tested over the radon reference level (EPA)
  • 2,028heating degree days at Castlebar

What's being built in Mayo

498 new homes were finished in Co. Mayo in 2025: 281 one-off houses, 154 scheme houses and 63 apartments (9th of 26 counties for one-off houses). 70% of all homes in Mayo are detached.

One-off houses mean foundations on open ground. The engineer looks at the ground first: strip footings on good ground, trench fill where the sides won't stand, a raft where it's soft. Then a ground floor slab of at least 150 mm on at least 200 mm of compacted hardcore. See concrete foundations.

Yards and farm slabs in Mayo

The CSO counts 11,920 farms in Co. Mayo, more than most counties. Yards, slatted sheds, silage slabs and calving pens are built to the Department of Agriculture's S.100 specification, with thicker slabs, a stronger mix and falls to the drains. A yard that takes a loaded tractor is a different pour from a garage floor. See yards and farm slabs.

Radon under the slab in Mayo

18% of the 5,076 homes the EPA has measured in Co. Mayo were at or above the radon reference level of 200 Bq/m³, above the national 14% (5th of 26).

Under a ground floor the layers go: hardcore, blinding, the damp-proof membrane joined to the wall DPCs, and in a High Radon Area a radon barrier sealed over the whole footprint with a sump under it. A radon barrier has been required in High Radon Areas since 1 July 1998, and every house since then needs a standby sump.

Winter pours in Mayo

Castlebar has about 2,028 heating degree days a year, our calculation from Met Éireann's 1991 to 2020 averages: a milder winter than the middle of the 26 counties (13th coldest).

Concrete has to stay above 5°C for its first 48 hours, until it's strong enough to take a frost. Winter pours are planned round the forecast, with frost blankets on the slab and no concrete on frozen ground. See how long concrete takes to cure.

Towns we cover in Co. Mayo

TownPeople, Census 2022
Castlebar13,054
Ballina10,556
Westport6,872
Claremorris3,857
Ballinrobe3,148
Ballyhaunis2,773
Swinford1,459
Foxford1,452

Neighbouring counties: Sligo, Roscommon, Galway.

Floors laid by the contractor who takes your call

Calls on this site ring JAM Floor Screeding: James Mulhall, based in Portlaoise, 25 years laying floors. Lines open Mon to Sat, 7am to 6pm. He pours concrete floors, slabs and foundations as well as screed. These are his jobs.

JAM Floor Screeding's yellow screed pump on its trailer at night
The JAM pump, packed up after a pour
A sand and cement screed floor in a new build with insulated walls
Sand and cement screed, new build
A wide pumped screed floor in an empty commercial unit
Commercial unit, pumped screed

“JAM were punctual, professional and efficient and did an outstanding job on pouring our new floor as part of a renovation. Very highly recommend!”

David O'Keeffe, Google review

“Excellent work, laser level finish, neat and tidy worker, highly recommend.”

Cathal Kelly, Google review

“Top class work by james and his crew, highly recommend”

the duke, Google review

Quoted word for word from JAM Floor Screeding's Google reviews. Read them on Google

Get the job priced in 4 quick taps

Tell us about the job. It goes to one concrete contractor who covers your county, and they ring you to price it.

What's the job?

Pick the closest one. The contractor talks it through.

By sending, you agree to Concrete Contractors passing your details to one concrete contractor who covers your county, so they can contact you about the job. Privacy notice

Concrete contractors guides & price breakdowns

Straight answers to what people ask most: itemised costs, specifications, planning or grants, and what to check before you book.

More guides & resources: Concrete vs screed · Slab depth for an extension · Building Regulations for concrete · All guides & calculator hub · Technical & trade glossary · Frequently asked questions · All areas covered · About this site

Mayo questions

Do you cover all of Co. Mayo?

Yes: Castlebar, Ballina, Westport, Claremorris, Ballinrobe and Ballyhaunis and everywhere in between. Send the job and one concrete contractor who covers your county rings you.

How much does a concrete slab cost in Mayo?

A slab is priced per m² and a foundation per metre, for your job: the area and depth, the concrete grade, the steel, access for the truck and what's under the slab. Send the job and you get a written price.

Does a new slab in Mayo need a radon barrier?

In a High Radon Area, yes, sealed over the whole footprint with a sump. 18% of homes measured in Mayo were over the reference level.

Can concrete be poured in a Mayo winter?

Yes, with planning: not on frozen ground, kept above 5°C for the first 48 hours, and covered against frost.

Concrete contractors across all 26 counties

Requests from all 26 counties go to one vetted local specialist who covers your county — from Dublin, Cork, Galway and Limerick to Kildare, Meath, Wicklow, Waterford and Donegal. Pick your county below for local prices, specifications and advice. Compare all areas covered →

Get a free quote for the job

Four taps and your number. One concrete contractor who covers your county rings you with a price. Nothing is booked until you say yes.