Concrete foundations

Most Irish houses and extensions stand on strip foundations: a continuous strip of concrete under each load-bearing wall. Trench fill is a strip foundation where the trench is almost filled with concrete. A raft is a reinforced slab that carries the whole building.

Under Technical Guidance Document A, a plain concrete strip foundation is at least 200 mm thick and at least 400 mm wide on good ground, wider as the wall load goes up or the ground gets softer.

Free, no obligation. One local concrete contractor prices it, not five.

Strip foundations

TGD A's rules for plain concrete strip foundations apply where the ground is known and even: no made ground, no wide variation in the subsoil under the building, and no weaker soil underneath that could affect it. The foundation sits centrally under the wall.

Subsoil (TGD A Table 5)30 kN/m40 kN/m50 kN/m60 kN/m70 kN/m
Compact gravel or sand; stiff clay400 mm400 mm500 mm600 mm650 mm
Firm clay400 mm450 mm500 mm600 mm650 mm
RockWall width + 150 mm
Loose sand, soft or very soft clay and siltSite investigation needed
  • Thickness: at least 200 mm, or the projection P from Table 5 if that's greater.
  • Width: never less than the wall plus 75 mm each side.
  • Steps: overlap by twice the step height, the foundation's thickness or 300 mm, whichever is greatest. No step higher than twice the foundation's thickness.
  • Concrete for plain foundations in non-aggressive ground: C12/15, at least 200 kg/m³ of cement, water/cement ratio no more than 0.85. A 1:7 mix by volume is allowed on small jobs.

Trench fill foundations

In a trench fill foundation the concrete is poured to within about 150 mm of ground level, so no blocks are laid below ground and nobody has to work in the trench. It suits loose soil and a high water table, but in loose ground the amount of concrete is hard to predict and can be large, especially where trenches meet.

In heavy clay, or near trees, trench fill can go deeper, to where the soil's moisture doesn't change. Mesh reinforcement is often needed then, and the trench sides may be lined with a compressible board.

Raft foundations

A raft is a reinforced concrete slab, typically 150 to 300 mm thick, covering the whole footprint. It spreads the walls' load over the ground. It can suit one and two-storey houses on poor ground, such as soft clay or fill, or where settlement is likely. As a rough rule, if strip foundations would cover half the floor area or more, a raft may make more sense.

A raft has to be designed by an engineer: the steel, the thickened edges and the ground under it are all calculated. It is less suited to heavy loads on a few points, and its edges need protecting from erosion.

Choosing between them

StripTrench fillRaft
What it isA strip of concrete under each wall, blocks up to ground levelThe trench almost filled with concreteOne reinforced slab under the whole building
SuitsKnown, even, firm groundLoose soil, high water table, getting out of the ground fastPoor or variable ground, settlement risk
ConcreteLeastMore, hard to predict in loose groundA reinforced slab, with more steel
Designed byTGD A tables on known ground; an engineer otherwiseEngineer or TGD A widthsEngineer

The ground decides. TGD A says that where there's doubt about the subsoil, and always on loose sand, silt or soft clay, a site investigation is essential before the foundation is designed.

What has to be ready

  • The engineer's foundation drawing and the building control commencement in place
  • Trenches dug to the depth and width on the drawing, bottoms clean and firm
  • Ground checked by the engineer where it's soft or varies
  • Steel fixed, on spacers, if the foundation is reinforced
  • Truck access, or a pump booked
  • Concrete never placed on frozen ground

Floors laid by the contractor who takes your call

Calls on this site ring JAM Floor Screeding: James Mulhall, based in Portlaoise, 25 years laying floors. Lines open Mon to Sat, 7am to 6pm. He pours concrete floors, slabs and foundations as well as screed. These are his jobs.

A sand and cement screed floor in a new build with insulated walls
Sand and cement screed, new build
A wide pumped screed floor in an empty commercial unit
Commercial unit, pumped screed
A screed pump and a worker in hi-vis outside a stone house being renovated
The pump on a stone house renovation

“JAM were punctual, professional and efficient and did an outstanding job on pouring our new floor as part of a renovation. Very highly recommend!”

David O'Keeffe, Google review

“Excellent work, laser level finish, neat and tidy worker, highly recommend.”

Cathal Kelly, Google review

“Top class work by james and his crew, highly recommend”

the duke, Google review

Quoted word for word from JAM Floor Screeding's Google reviews. Read them on Google

Get the job priced in 4 quick taps

Tell us about the job. It goes to one concrete contractor who covers your county, and they ring you to price it.

What's the job?

Pick the closest one. The contractor talks it through.

By sending, you agree to Concrete Contractors passing your details to one concrete contractor who covers your county, so they can contact you about the job. Privacy notice

Concrete contractors guides & price breakdowns

Straight answers to what people ask most: itemised costs, specifications, planning or grants, and what to check before you book.

More guides & resources: Concrete vs screed · Slab depth for an extension · Building Regulations for concrete · All guides & calculator hub · Technical & trade glossary · Frequently asked questions · All areas covered · About this site

Concrete foundations questions

How wide should a strip foundation be?

On good ground, at least 400 mm for walls up to 40 kN/m, rising to 650 mm at 70 kN/m (TGD A Table 5), and never less than the wall plus 75 mm each side. Soft ground needs a site investigation.

How thick should a strip foundation be?

At least 200 mm of concrete under TGD A, or more where the projection from Table 5 is greater.

What is a trench fill foundation?

A strip foundation where the trench is filled with concrete to within about 150 mm of ground level, so no blocks are laid below ground.

When is a raft foundation used?

On poor or variable ground, where settlement is likely, or where strip foundations would cover half the floor or more. A raft is a reinforced slab, typically 150 to 300 mm thick, designed by an engineer.

What concrete is used for foundations?

For plain strip foundations in non-aggressive ground, TGD A gives C12/15 with at least 200 kg/m³ of cement. Under I.S. EN 206, many foundations are exposure class XC2, C28/35 minimum, for reinforced work.

Concrete contractors across all 26 counties

Requests from all 26 counties go to one vetted local specialist who covers your county — from Dublin, Cork, Galway and Limerick to Kildare, Meath, Wicklow, Waterford and Donegal. Pick your county below for local prices, specifications and advice. Compare all areas covered →

Get a free quote for the job

Four taps and your number. One concrete contractor who covers your county rings you with a price. Nothing is booked until you say yes.